03.4 / AILITE

From a task to action and product history.

Plan prepares the operation. Run combines measurements and supports control within agreed limits. Pass retains data, actions and inspection results.

01 / ONE PLATFORM · THREE STAGES

Prepare the operation

Task, path, process constraints and measurement channels. Before starting, we define what the system must do and how the result will be verified.

Equipment interfaces

Connected channels and adapters are defined in the specification. Control passes through the equipment controllers.

Action validation

A proposed correction is independently validated. Hardware safety functions operate separately.

Data and rights

Retention, export and access are agreed in advance. Model training on your data requires a separate agreement.

03FROM PROCESS TO DATA
Welding process recording with the observation area marked
Smartmetal archive · recording dated 17 Sep 2025. Conditions shown in the image apply to this recording; frame rate and exposure are not specified in the source.

Observe. Measure. Understand.

One process produces different signals. We choose the measurement channels that answer your question.

See the working area

Cameras record the process. Calibrated stereo channels measure geometry within a selected range.

About the measurement channel
01

Process

Working area, part, event.

02

Measurements

Sensors and a shared timebase.

03

Permitted action

Independent command validation.

04

Digital history

Data, actions and inspection results.

03IMPLEMENTATION SCOPE

Functions for your operation.

01

Task

Part, process, initial data and expected result.

02

Selection

System configuration, interfaces and functional boundaries.

03

Integration

Site preparation, connection and training.

04

Acceptance

Verification in agreed operating conditions and documentation.

05

Support

Maintenance and system development within the agreed scope.

The digital record complements quality inspection, including the non-destructive testing specified for the part.

↳YOUR NEXT PROJECT

Let’s discuss AILITE

Tell us about the part, process or experiment. We will select a configuration and agree how to verify the result.

Timur Sulutdinov · Smartmetal

Confidential materials can be shared after an NDA is agreed.

Online enquiries are temporarily unavailable

Please call to discuss equipment, services or support. Please do not send contact details or files through the website at this time.

Call +7 905 711-22-44